[PATCH] drm/scheduler: don't update last scheduled fence in TDR

zhoucm1 zhoucm1 at amd.com
Thu Apr 26 04:23:20 UTC 2018


NAK on it.

First of all, without this patch, Does it cause any issue?

second,

entity->last_scheduled present the last submiting job.

Your this change will break this meaning and don't work, e.g.

1. mirror list has jobA and jobB, assuming they are belonged to same 
entity, then the entity->last_scheduled is jobB->finished.

2. when you do recovery, re-submit jobA first, if don't update 
last_scheduled, then entity->last_scheduled still is jobB->finished.

3. killed this process, will call to drm_sched_entity_cleanup, will 
register drm_sched_entity_kill_jobs_cb to jobB->finished, but jobB isn't 
submitted at all.


So the change isn't necessary at all.


Regards,

David Zhou


On 2018年04月26日 11:47, Ding, Pixel wrote:
> Hi Monk,
>
> Please review it. Thanks.
>
>> Sincerely Yours,
> Pixel
>
>
> On 2018/4/25, 4:39 PM, "Pixel Ding" <Pixel.Ding at amd.com> wrote:
>
>      The current sequence in scheduler thread is:
>      1. update last sched fence
>      2. job begin (adding to mirror list)
>      3. job finish (remove from mirror list)
>      4. back to 1
>      
>      Since we update last sched prior to joining mirror list, the jobs
>      in mirror list already pass the last sched fence. TDR just run
>      the jobs in mirror list, so we should not update the last sched
>      fences in TDR.
>      
>      Signed-off-by: Pixel Ding <Pixel.Ding at amd.com>
>      ---
>       drivers/gpu/drm/scheduler/gpu_scheduler.c | 3 ---
>       1 file changed, 3 deletions(-)
>      
>      diff --git a/drivers/gpu/drm/scheduler/gpu_scheduler.c b/drivers/gpu/drm/scheduler/gpu_scheduler.c
>      index 088ff2b..1f1dd70 100644
>      --- a/drivers/gpu/drm/scheduler/gpu_scheduler.c
>      +++ b/drivers/gpu/drm/scheduler/gpu_scheduler.c
>      @@ -575,9 +575,6 @@ void drm_sched_job_recovery(struct drm_gpu_scheduler *sched)
>       		fence = sched->ops->run_job(s_job);
>       		atomic_inc(&sched->hw_rq_count);
>       
>      -		dma_fence_put(s_job->entity->last_scheduled);
>      -		s_job->entity->last_scheduled = dma_fence_get(&s_fence->finished);
>      -
>       		if (fence) {
>       			s_fence->parent = dma_fence_get(fence);
>       			r = dma_fence_add_callback(fence, &s_fence->cb,
>      --
>      2.7.4
>      
>      
>
> _______________________________________________
> amd-gfx mailing list
> amd-gfx at lists.freedesktop.org
> https://lists.freedesktop.org/mailman/listinfo/amd-gfx



More information about the amd-gfx mailing list