nouveau regression with 5.7 caused by "PCI/PM: Assume ports without DLL Link Active train links in 100 ms"

Mika Westerberg mika.westerberg at linux.intel.com
Tue Jul 21 12:22:47 UTC 2020


Hi,

[Sorry for the delay, I was on vacation]

On Fri, Jul 17, 2020 at 01:32:10PM +0200, Karol Herbst wrote:
> Filed at https://bugzilla.kernel.org/show_bug.cgi?id=208597

Thanks for reporting.

I'll check your logs and try to figure if there is something we can do
to make both nouveau and TBT working at the same time.

> oddly enough I wasn't able to reproduce it on my XPS 9560, will ping
> once something breaks.


More information about the dri-devel mailing list