[PATCH v1] drm/scheduler: Fix lockup in drm_sched_entity_kill()
Dmitry Osipenko
dmitry.osipenko at collabora.com
Wed Nov 23 00:13:03 UTC 2022
The drm_sched_entity_kill() is invoked twice by drm_sched_entity_destroy()
while userspace process is exiting or being killed. First time it's invoked
when sched entity is flushed and second time when entity is released. This
causes a lockup within wait_for_completion(entity_idle) due to how completion
API works.
Calling wait_for_completion() more times than complete() was invoked is a
error condition that causes lockup because completion internally uses
counter for complete/wait calls. The complete_all() must be used instead
in such cases.
This patch fixes lockup of Panfrost driver that is reproducible by killing
any application in a middle of 3d drawing operation.
Fixes: 2fdb8a8f07c2 ("drm/scheduler: rework entity flush, kill and fini")
Signed-off-by: Dmitry Osipenko <dmitry.osipenko at collabora.com>
---
drivers/gpu/drm/scheduler/sched_entity.c | 2 +-
drivers/gpu/drm/scheduler/sched_main.c | 4 ++--
2 files changed, 3 insertions(+), 3 deletions(-)
diff --git a/drivers/gpu/drm/scheduler/sched_entity.c b/drivers/gpu/drm/scheduler/sched_entity.c
index fe09e5be79bd..15d04a0ec623 100644
--- a/drivers/gpu/drm/scheduler/sched_entity.c
+++ b/drivers/gpu/drm/scheduler/sched_entity.c
@@ -81,7 +81,7 @@ int drm_sched_entity_init(struct drm_sched_entity *entity,
init_completion(&entity->entity_idle);
/* We start in an idle state. */
- complete(&entity->entity_idle);
+ complete_all(&entity->entity_idle);
spin_lock_init(&entity->rq_lock);
spsc_queue_init(&entity->job_queue);
diff --git a/drivers/gpu/drm/scheduler/sched_main.c b/drivers/gpu/drm/scheduler/sched_main.c
index 6ce04c2e90c0..857ec20be9e8 100644
--- a/drivers/gpu/drm/scheduler/sched_main.c
+++ b/drivers/gpu/drm/scheduler/sched_main.c
@@ -1026,7 +1026,7 @@ static int drm_sched_main(void *param)
sched_job = drm_sched_entity_pop_job(entity);
if (!sched_job) {
- complete(&entity->entity_idle);
+ complete_all(&entity->entity_idle);
continue;
}
@@ -1037,7 +1037,7 @@ static int drm_sched_main(void *param)
trace_drm_run_job(sched_job, entity);
fence = sched->ops->run_job(sched_job);
- complete(&entity->entity_idle);
+ complete_all(&entity->entity_idle);
drm_sched_fence_scheduled(s_fence);
if (!IS_ERR_OR_NULL(fence)) {
--
2.38.1
More information about the dri-devel
mailing list