[PATCH v3 2/5] drm/sched/tests: Port tests to new cleanup method

Philipp Stanner phasta at kernel.org
Thu May 22 08:27:40 UTC 2025


The drm_gpu_scheduler now supports a callback to help drm_sched_fini()
avoid memory leaks. This callback instructs the driver to signal all
pending hardware fences.

Implement the new callback
drm_sched_backend_ops.cancel_pending_fences().

Have the callback use drm_mock_sched_job_complete() with a new error
field for the fence error.

Keep the job status as DRM_MOCK_SCHED_JOB_DONE for now, since there is
no party for which checking for a CANCELED status would be useful
currently.

Signed-off-by: Philipp Stanner <phasta at kernel.org>
---
 .../gpu/drm/scheduler/tests/mock_scheduler.c  | 67 +++++++------------
 drivers/gpu/drm/scheduler/tests/sched_tests.h |  4 +-
 2 files changed, 25 insertions(+), 46 deletions(-)

diff --git a/drivers/gpu/drm/scheduler/tests/mock_scheduler.c b/drivers/gpu/drm/scheduler/tests/mock_scheduler.c
index f999c8859cf7..eca47f0395bc 100644
--- a/drivers/gpu/drm/scheduler/tests/mock_scheduler.c
+++ b/drivers/gpu/drm/scheduler/tests/mock_scheduler.c
@@ -55,7 +55,7 @@ void drm_mock_sched_entity_free(struct drm_mock_sched_entity *entity)
 	drm_sched_entity_destroy(&entity->base);
 }
 
-static void drm_mock_sched_job_complete(struct drm_mock_sched_job *job)
+static void drm_mock_sched_job_complete(struct drm_mock_sched_job *job, int err)
 {
 	struct drm_mock_scheduler *sched =
 		drm_sched_to_mock_sched(job->base.sched);
@@ -63,7 +63,9 @@ static void drm_mock_sched_job_complete(struct drm_mock_sched_job *job)
 	lockdep_assert_held(&sched->lock);
 
 	job->flags |= DRM_MOCK_SCHED_JOB_DONE;
-	list_move_tail(&job->link, &sched->done_list);
+	list_del(&job->link);
+	if (err)
+		dma_fence_set_error(&job->hw_fence, err);
 	dma_fence_signal(&job->hw_fence);
 	complete(&job->done);
 }
@@ -89,7 +91,7 @@ drm_mock_sched_job_signal_timer(struct hrtimer *hrtimer)
 			break;
 
 		sched->hw_timeline.cur_seqno = job->hw_fence.seqno;
-		drm_mock_sched_job_complete(job);
+		drm_mock_sched_job_complete(job, 0);
 	}
 	spin_unlock_irqrestore(&sched->lock, flags);
 
@@ -212,26 +214,33 @@ mock_sched_timedout_job(struct drm_sched_job *sched_job)
 
 static void mock_sched_free_job(struct drm_sched_job *sched_job)
 {
-	struct drm_mock_scheduler *sched =
-			drm_sched_to_mock_sched(sched_job->sched);
 	struct drm_mock_sched_job *job = drm_sched_job_to_mock_job(sched_job);
-	unsigned long flags;
 
-	/* Remove from the scheduler done list. */
-	spin_lock_irqsave(&sched->lock, flags);
-	list_del(&job->link);
-	spin_unlock_irqrestore(&sched->lock, flags);
 	dma_fence_put(&job->hw_fence);
-
 	drm_sched_job_cleanup(sched_job);
 
 	/* Mock job itself is freed by the kunit framework. */
 }
 
+static void mock_sched_cancel_pending_fences(struct drm_gpu_scheduler *gsched)
+{
+	struct drm_mock_sched_job *job, *next;
+	struct drm_mock_scheduler *sched;
+	unsigned long flags;
+
+	sched = container_of(gsched, struct drm_mock_scheduler, base);
+
+	spin_lock_irqsave(&sched->lock, flags);
+	list_for_each_entry_safe(job, next, &sched->job_list, link)
+		drm_mock_sched_job_complete(job, -ECANCELED);
+	spin_unlock_irqrestore(&sched->lock, flags);
+}
+
 static const struct drm_sched_backend_ops drm_mock_scheduler_ops = {
 	.run_job = mock_sched_run_job,
 	.timedout_job = mock_sched_timedout_job,
-	.free_job = mock_sched_free_job
+	.free_job = mock_sched_free_job,
+	.cancel_pending_fences = mock_sched_cancel_pending_fences,
 };
 
 /**
@@ -265,7 +274,6 @@ struct drm_mock_scheduler *drm_mock_sched_new(struct kunit *test, long timeout)
 	sched->hw_timeline.context = dma_fence_context_alloc(1);
 	atomic_set(&sched->hw_timeline.next_seqno, 0);
 	INIT_LIST_HEAD(&sched->job_list);
-	INIT_LIST_HEAD(&sched->done_list);
 	spin_lock_init(&sched->lock);
 
 	return sched;
@@ -280,38 +288,11 @@ struct drm_mock_scheduler *drm_mock_sched_new(struct kunit *test, long timeout)
  */
 void drm_mock_sched_fini(struct drm_mock_scheduler *sched)
 {
-	struct drm_mock_sched_job *job, *next;
-	unsigned long flags;
-	LIST_HEAD(list);
+	struct drm_mock_sched_job *job;
 
-	drm_sched_wqueue_stop(&sched->base);
-
-	/* Force complete all unfinished jobs. */
-	spin_lock_irqsave(&sched->lock, flags);
-	list_for_each_entry_safe(job, next, &sched->job_list, link)
-		list_move_tail(&job->link, &list);
-	spin_unlock_irqrestore(&sched->lock, flags);
-
-	list_for_each_entry(job, &list, link)
+	list_for_each_entry(job, &sched->job_list, link)
 		hrtimer_cancel(&job->timer);
 
-	spin_lock_irqsave(&sched->lock, flags);
-	list_for_each_entry_safe(job, next, &list, link)
-		drm_mock_sched_job_complete(job);
-	spin_unlock_irqrestore(&sched->lock, flags);
-
-	/*
-	 * Free completed jobs and jobs not yet processed by the DRM scheduler
-	 * free worker.
-	 */
-	spin_lock_irqsave(&sched->lock, flags);
-	list_for_each_entry_safe(job, next, &sched->done_list, link)
-		list_move_tail(&job->link, &list);
-	spin_unlock_irqrestore(&sched->lock, flags);
-
-	list_for_each_entry_safe(job, next, &list, link)
-		mock_sched_free_job(&job->base);
-
 	drm_sched_fini(&sched->base);
 }
 
@@ -346,7 +327,7 @@ unsigned int drm_mock_sched_advance(struct drm_mock_scheduler *sched,
 		if (sched->hw_timeline.cur_seqno < job->hw_fence.seqno)
 			break;
 
-		drm_mock_sched_job_complete(job);
+		drm_mock_sched_job_complete(job, 0);
 		found++;
 	}
 unlock:
diff --git a/drivers/gpu/drm/scheduler/tests/sched_tests.h b/drivers/gpu/drm/scheduler/tests/sched_tests.h
index 27caf8285fb7..22e530d87791 100644
--- a/drivers/gpu/drm/scheduler/tests/sched_tests.h
+++ b/drivers/gpu/drm/scheduler/tests/sched_tests.h
@@ -32,9 +32,8 @@
  *
  * @base: DRM scheduler base class
  * @test: Backpointer to owning the kunit test case
- * @lock: Lock to protect the simulated @hw_timeline, @job_list and @done_list
+ * @lock: Lock to protect the simulated @hw_timeline and @job_list
  * @job_list: List of jobs submitted to the mock GPU
- * @done_list: List of jobs completed by the mock GPU
  * @hw_timeline: Simulated hardware timeline has a @context, @next_seqno and
  *		 @cur_seqno for implementing a struct dma_fence signaling the
  *		 simulated job completion.
@@ -49,7 +48,6 @@ struct drm_mock_scheduler {
 
 	spinlock_t		lock;
 	struct list_head	job_list;
-	struct list_head	done_list;
 
 	struct {
 		u64		context;
-- 
2.49.0



More information about the dri-devel mailing list