[igt-dev] [PATCH i-g-t v2 3/3] tests/gem_lmem_swapping: reduce the timeout
Matthew Auld
matthew.auld at intel.com
Fri Mar 25 09:09:58 UTC 2022
300s is way too much for some BAT test. Drop it down to 45s.
Signed-off-by: Matthew Auld <matthew.auld at intel.com>
Cc: Thomas Hellström <thomas.hellstrom at linux.intel.com>
Cc: Nirmoy Das <nirmoy.das at linux.intel.com>
Reviewed-by: Thomas Hellström <thomas.hellstrom at linux.intel.com>
---
tests/i915/gem_lmem_swapping.c | 2 +-
1 file changed, 1 insertion(+), 1 deletion(-)
diff --git a/tests/i915/gem_lmem_swapping.c b/tests/i915/gem_lmem_swapping.c
index 526835cc..31644bcd 100644
--- a/tests/i915/gem_lmem_swapping.c
+++ b/tests/i915/gem_lmem_swapping.c
@@ -219,7 +219,7 @@ static void __do_evict(int i915,
* For TEST_MULTI runs, make each object counts a loop to
* avoid excessive run times.
*/
- for (l = 0; l < params->loops && igt_seconds_elapsed(&t) < 300; l += num) {
+ for (l = 0; l < params->loops && igt_seconds_elapsed(&t) < 45; l += num) {
unsigned int idx = rand() % params->count;
num = params->flags & TEST_MULTI ? rand() % max_swap_in + 1 : 1;
--
2.34.1
More information about the igt-dev
mailing list