[Intel-gfx] [PATCH i-g-t] tests/i915: Skip gem_exec_fair on GuC based platforms

John.C.Harrison at Intel.com John.C.Harrison at Intel.com
Wed Oct 13 22:43:17 UTC 2021


From: John Harrison <John.C.Harrison at Intel.com>

The gem_exec_fair test is specifically testing scheduler algorithm
performance. However, GuC does not implement the same algorithm as
execlist mode and this test is not applicable. So, until sw arch
approves a new algorithm and it is implemented in GuC, stop running
the test.

Signed-off-by: John Harrison <John.C.Harrison at Intel.com>
---
 tests/i915/gem_exec_fair.c | 6 ++++++
 1 file changed, 6 insertions(+)

diff --git a/tests/i915/gem_exec_fair.c b/tests/i915/gem_exec_fair.c
index ef5a450f6..ca9c73c6e 100644
--- a/tests/i915/gem_exec_fair.c
+++ b/tests/i915/gem_exec_fair.c
@@ -1314,6 +1314,12 @@ igt_main
 		igt_require(gem_scheduler_enabled(i915));
 		igt_require(gem_scheduler_has_ctx_priority(i915));
 
+		/*
+		 * These tests are for a specific scheduling model which is
+		 * not currently implemented by GuC. So skip on GuC platforms.
+		 */
+		igt_require(intel_gen(intel_get_drm_devid(i915)) < 12);
+
 		cfg = intel_ctx_cfg_all_physical(i915);
 
 		igt_info("CS timestamp frequency: %d\n",
-- 
2.25.1



More information about the Intel-gfx mailing list