[Intel-xe] [PATCH v3 09/13] drm/sched: Submit job before starting TDR
Luben Tuikov
luben.tuikov at amd.com
Thu Sep 14 02:56:10 UTC 2023
On 2023-09-11 22:16, Matthew Brost wrote:
> If the TDR is set to a value, it can fire before a job is submitted in
> drm_sched_main. The job should be always be submitted before the TDR
> fires, fix this ordering.
>
> v2:
> - Add to pending list before run_job, start TDR after (Luben, Boris)
>
> Signed-off-by: Matthew Brost <matthew.brost at intel.com>
> ---
> drivers/gpu/drm/scheduler/sched_main.c | 2 +-
> 1 file changed, 1 insertion(+), 1 deletion(-)
>
> diff --git a/drivers/gpu/drm/scheduler/sched_main.c b/drivers/gpu/drm/scheduler/sched_main.c
> index c627d3e6494a..9dbfab7be2c6 100644
> --- a/drivers/gpu/drm/scheduler/sched_main.c
> +++ b/drivers/gpu/drm/scheduler/sched_main.c
> @@ -498,7 +498,6 @@ static void drm_sched_job_begin(struct drm_sched_job *s_job)
>
> spin_lock(&sched->job_list_lock);
> list_add_tail(&s_job->list, &sched->pending_list);
> - drm_sched_start_timeout(sched);
> spin_unlock(&sched->job_list_lock);
> }
>
> @@ -1234,6 +1233,7 @@ static void drm_sched_run_job_work(struct work_struct *w)
> fence = sched->ops->run_job(sched_job);
> complete_all(&entity->entity_idle);
> drm_sched_fence_scheduled(s_fence, fence);
> + drm_sched_start_timeout_unlocked(sched);
>
> if (!IS_ERR_OR_NULL(fence)) {
> /* Drop for original kref_init of the fence */
So, sched->ops->run_job(), is a "job inflection point" from the point of view of
the DRM scheduler. After that call, DRM has relinquished control of the job to the
firmware/hardware.
Putting the job in the pending list, before submitting it to down to the firmware/hardware,
goes along with starting a timeout timer for the job. The timeout always includes
time for the firmware/hardware to get it prepped, as well as time for the actual
execution of the job (task). Thus, we want to do this:
1. Put the job in pending list. "Pending list" means "pends in hardware".
2. Start a timeout timer for the job.
3. Start executing the job/task. This usually involves giving it to firmware/hardware,
i.e. ownership of the job/task changes to another domain. In our case this is accomplished
by calling sched->ops->run_job().
Perhaps move drm_sched_start_timeout() closer to sched->ops->run_job() from above and/or increase
the timeout value?
--
Regards,
Luben
More information about the Intel-xe
mailing list